Mirvac were looking for a company to come through on both design and installation of the electrical components of their project. Oncore worked together to design and install electrical components across three levels of offices in the Mirvac building.

Mirvac entrusted us to provide this for them, we began with the design and approval stage and then we set to work on the installation stage of this project.

Oncore Electrical completed:

-3 levels of office revamping – including several lobbies

-Revamped the office space with lighting and design.

-Installed a variety of different lights such as LED Strips/lights, pendants, downlights and wall lights.

-Installed lighting control systems such as Smart lighting.


Oncore also provided:

-Data & Communication installation for across the office levels

-Installed security panels/ swapped over card readers

-Designed and installed their Data Network / Fibre backbone cabling